Old Delhi
Old Delhi, Delhi

Bottling Plant Manufacturer & Service in Old Delhi

Our full range in Old Delhi — mineral water, juice and soft drink plants, PET blow moulding, water treatment, filling and packaging — supplied turnkey or standalone, installed and serviced with 24 hours (NCR-wide) engineer dispatch. Everything priced on request.

24 hours (NCR-wide)
·
Serving Old Delhi & nearby
Quote in 24 hours · Old Delhi

Old Delhi-specific quotation

Itemised quote, plant layout, BIS / FSSAI checklist.

Confidential. We never share your data.

01Popular here

Most-installed plants for Old Delhi buyers

Configurations matched to local feedwater chemistry and distribution patterns.

Service from Delhi

Why our service to Old Delhi works.

  • 1
    On-site engineer dispatch within 24 hours across NCR (Delhi, Gurugram, Noida, Faridabad, Ghaziabad)
  • 2
    BIS / ISI registration consultation included
  • 3
    Spare parts depot in NCR, same-day critical-spares delivery
  • 4
    Turnkey civil + utility planning for cramped industrial plots
  • 5
    Most installations run on tight Delhi groundwater with high TDS, our twin-pass RO is calibrated for it
02FAQ

Mineral water plant in Old Delhi

What do you supply and service in Old Delhi?+

Our full range — mineral water, juice and carbonated soft drink plants, PET blow moulding, water treatment, pouch and cup lines, filling, packaging and plant utilities — supplied turnkey or as standalone equipment in Old Delhi and across Delhi, with 24 hours (NCR-wide) engineer dispatch. We also take on AMC and retrofit work on plants supplied by other manufacturers.

Which capacity plant is best for Old Delhi?+

For new entrants serving Old Delhi and surrounding districts, a 30 or 60 BPM plant works well. For brands targeting state-wide distribution from Old Delhi, 90 or 120 BPM is the right tier. Capacities up to 240 / 480 BPM are also supported for industrial / co-packing operations.

How fast can you commission a plant in Old Delhi?+

From PO confirmation: 6–8 weeks for a 30 BPM plant, 8–11 weeks for 60 BPM, 12–16 weeks for 120 BPM. Our Delhi service team supports civil readiness coordination so customer-side timelines stay aligned.

Do you handle BIS / FSSAI documentation for Old Delhi plants?+

Yes. Every turnkey contract includes BIS-IS-14543 document preparation, FSSAI consultation, and CGWB / Delhi pollution-board NOC coordination at no extra cost.

Old Delhi response

Talk to our Delhi engineers.

State-specific quote in 24 hours. 24 hours (NCR-wide) engineer dispatch.

CallWhatsAppGet Quote →