Mineral Water Plant in Narela
Narela, Delhi

Mineral Water Plant in Narela

Turnkey packaged drinking water plants from 12 BPM starter lines to 480 BPM industrial plants, with BIS IS 14543 documentation included.

Price on Request
  • Turnkey: civil layout to commissioning
  • BIS / FSSAI documentation included
  • Engineers on site across North India
  • Spares and AMC after handover

Enquire for Narela

Quotation, layout drawing and licence checklist in 24 hours.

Confidential. We never share your data.

Overview

Building a mineral water plant in Narela.

We design, manufacture, install and service turnkey mineral water plants in Narela. Scope runs from the raw water borewell to the palletised carton — treatment train, RFC monoblock, packaging, civil layout, utility schedule, BIS and FSSAI documentation, commissioning and operator training. Because Narela groundwater has its own character, the treatment train is designed against your actual water analysis rather than a catalogue specification.

A genuine manufacturing belt rather than a retail market. Plot availability and power sanction are easier than in central Delhi, which is why several NCR water and beverage co-packers sit here and distribute inward.

Narela water profile

North Delhi groundwater is moderately saline with TDS commonly 900–1,800 ppm and elevated hardness. Proximity to the Yamuna floodplain means seasonal variation is real, so RO sizing should be based on the summer worst case, not a monsoon sample.

Industrial areas we serve
Narela Industrial AreaDSIIDC NarelaBawana adjoining sectors
Response
< 4 hrs
Reply
< 24 hrs
Quote
< 7 days
Site visit
Configurations

Mineral Water Plant options for Narela.

Every configuration below is supplied turnkey or as standalone equipment, and every one is priced on request against your capacity, feedwater and plot.

Turnkey scope

What we deliver on a Narela project.

01

Raw water survey

Borewell analysis, TDS, hardness, iron, fluoride and arsenic screening before anything is sized.

02

Treatment train design

Sand, carbon, softener, RO staging, UV, ozone and remineralisation matched to your feedwater.

03

Civil & utility drawings

Layout, hygiene zoning, drainage, power and air schedules issued before machinery ships.

04

Machinery & installation

RFC monoblock, conveying, labelling, coding, shrink wrapping, erected and commissioned on site.

05

BIS / FSSAI documentation

IS 14543 file preparation, QC lab specification, SOPs, test record formats and inspection readiness.

06

Training & handover

Operator and chemist training, trial production runs, and a documented handover.

How it runs

From first call to a running line.

1

Site & water survey

We collect your borewell analysis, plot dimensions, power sanction and target output.

2

Layout & proposal

Itemised quotation, plant layout drawing, utility schedule and a licence checklist within 24 hours.

3

Manufacturing

Fabrication, assembly and factory acceptance testing at our works, with progress photographs.

4

Installation

Erection, piping, wiring and commissioning on your site by our own engineers.

5

Trials & training

Trial production, quality validation, operator and chemist training, documented handover.

6

Service & AMC

Spares, preventive maintenance and 24×7 phone and WhatsApp support after handover.

What people ask us

If you are searching for any of these, you are in the right place.

We answer all of it on one call — capacity sizing, licence route, plot requirement, utility load, timeline and an itemised quotation.

Ask our engineers
mineral water plant in Narelamineral water plant manufacturer in Narelamineral water plant setup cost in Narelapackaged drinking water plant in Narelawater bottling plant in Narelamineral water plant price in NarelaRO water plant manufacturer in Narela20 litre jar water plant in Narela
FAQ

Frequently Asked

Have a question we haven't covered? Talk to our team on WhatsApp or call us directly.

Machinery commissioning runs 6–8 weeks for a 30 BPM line, 8–11 weeks for 60 BPM and 12–16 weeks for 120 BPM, from purchase order. BIS certification runs in parallel and is usually the longer path, so plan the licence application at the same time as the plot, not after commissioning.
Narela enquiry

Talk to us about your mineral water project in Narela.

Itemised quotation, plant layout drawing and a licence checklist within 24 hours. No obligation.

CallWhatsAppGet Quote →